50 Videos from United States Customs Border Protection (#USCBP)

us-mx border wall
This blog is mainly an index for 50 videos we’ve place on YouTube and Twitter. The links to twitter videos will be added as we post the same YouTube video to twitter.

VIDEOS

The final section of the San Diego Border Wall was recently installed.
https://youtu.be/RBpUfFAB0ic (Length 5:36)
Taken 08.16.2019
qt-wall-vid-180
Video of the construction process in Yuma, AZ for the New Border Wall.
https://youtu.be/g9_4y2SolTc (53 seconds)
Taken 08.19.2019
qt-wall-vid-181

Justin Delatorre, #USBP, Imperial Beach Station, speaks to the benefits of the new border wall.
https://youtu.be/s0V1lbXmi80 (50 seconds)
Taken 07.24.2019
qt-wall-vid-182

Construction crews work on the new border wall system along the Southwest border near San Luis, Az
https://youtu.be/H98KojmnWo0 (54 seconds)
Taken 08.20.2019
qt-wall-vid-183

Construction crews continue work on the new border wall system near San Luis, Ariz.
https://youtu.be/4a5EhnKwd7A (59 seconds)
Taken 08.21.2019
qt-wall-vid-184

Construction crews work on the replacement border wall on the U.S.-Mexico near Imperial Beach, CA
https://youtu.be/HNbmAOjvdAU (52 seconds)
Taken 07.24.2019
qt-wall-vid-185

Approximately 1 mile west of the San Luis, AZ POE and what typical traffic looked like in 2005
https://youtu.be/AluEZ62YmtE (19 seconds)
Taken 07.24.2019
qt-wall-vid-186

CBP, United States Border Patrol, San Diego Sector of last fence panel installation San Ysidro, CA
https://youtu.be/MVu_rR-gdX4 (2 minutes)
Taken 08.09.2019
qt-wall-vid-187

CBP, United States Border Patrol, San Diego Sector of last fence panel installation San Ysidro, CA
https://youtu.be/oTXgduTOoSc (1:42)
Taken 08.09.2019
qt-wall-vid-188

CBP, United States Border Patrol, San Diego Sector of last fence panel installation San Ysidro, CA
https://youtu.be/taludcZ5Cis (21 seconds)
Taken 08.09.2019
qt-wall-vid-189

CBP, United States Border Patrol, San Diego Sector of last fence panel installation San Ysidro, CA
https://youtu.be/LEyVWTrGLFM (3 minutes)
Taken 08.09.2019
qt-wall-vid-190

Just south of Yuma, AZ #USACE is erecting nearly 22 miles of 18- and 30-foot-tall border barrier
https://youtu.be/qaC2g3Zd-_A (2:41)
Taken 09.24.2019
qt-wall-vid-191

#USCBP has completed construction on more than 75 miles of new border wall system
https://youtu.be/MhTUWPC8XNU (2:28)
Taken 10.24.2019
qt-wall-vid-192

USCBP has completed 75+ miles of new border wall system in California, Arizona, New Mexico and Texas
https://youtu.be/kknvTaV6R4Q (43 seconds)
Taken 10.24.2019
qt-wall-vid-193

Captured 17-18 October 2019, this video shows the Primary and Secondary border barriers in San Diego
https://youtu.be/0e4EOLjgDCE (3:27)
Taken 10.17.2019
qt-wall-vid-194

Border Wall System Construction, Rio Grande Valley, Texas
https://youtu.be/7m-uc-CF1mE (2:08)
Taken 10.31.2019
qt-wall-vid-195

The Primary and Secondary border barriers in San Diego. This version does not have title pages
https://youtu.be/fKsLZY_T8po (3:27)
Taken 10.17.2019
qt-wall-vid-196

Construction crews place steel bollards at Tucson 3 project along the border near Douglas, AZ
https://youtu.be/JyJ_1JM57bY (19 seconds)
Taken 01.15.2020
qt-wall-vid-197

The El Centro 1 project spans fifteen miles, near Calexico, CA, January 23, 2020
https://youtu.be/4nEWRt8KICA (7 minutes 28 seconds)
Taken 01.23.2020
qt-wall-vid-198

The El Centro 1 project near Calexico, CA, January 23, 2020. Border Monument 225
https://youtu.be/opEfz57JujM (1:26)
Taken 01.23.2020
qt-wall-vid-199

Single shot of the barrier as the camera passes continuously
https://youtu.be/gJx954ZzeQk (23 seconds)
Taken 01.23.2020
qt-wall-vid-200

Shots of barrier panning from top to bottom – The El Centro 1 project
https://youtu.be/NuPdV8_-QRg (43 seconds)
Taken 01.23.2020
qt-wall-vid-201

Various pans of the border barrier barrier. – The El Paso 1 project
https://youtu.be/KZVIGqkXpHY (4:03)
Taken 01.28.2020
qt-wall-vid-202

Single shot of the barrier as the camera passes continuously – El Paso 1 project
https://youtu.be/r0skheppN5I (1 minute)
Taken 01.28.2020
qt-wall-vid-203

Workers pour concrete into a footer mold for new barrier at the Yuma 1 project
https://youtu.be/94WU_XtyVCo (32 seconds)
Taken 02.19.2020
qt-wall-vid-204



Crews install a three-ton, 30-foot barrier panel at the Barry M. Goldwater Range near Yuma, Arizona
https://youtu.be/73ckWNmr69M (31 seconds)
Taken 02.21.2020
qt-wall-vid-205
Workers construct border barrier panels for the border barrier near the Barry M. Goldwater Range
https://youtu.be/2ZbWQFWjyrw (1 minutes)
Taken 02.27.2020
qt-wall-vid-206
Crews install a three-ton, 30-foot barrier panel at Heading Two at the El Centro 1 border barrier
https://youtu.be/4OrM68XExRc (32 seconds)
Taken 02.28.2020
qt-wall-vid-207
Workers use concrete to build a low water crossing at the El Centro 1 border barrier location
https://youtu.be/aHJbmcH8DkU (33 seconds)
Taken 02.28.2020
qt-wall-vid-208
Workers use a track hoe to pull a sled with barrier panels up a hill to a panel installation site
https://youtu.be/7aFuDsPOCZA (27 seconds)
Taken 02.28.2020
qt-wall-vid-209
Crews install a 30-foot barrier panel on the side of a hill at Heading Three at the El Centro 1
https://youtu.be/Stc6CUhYvsQ (1:38)
Taken 02.28.2020
qt-wall-vid-210
Crews install a three-ton, 30-foot barrier panel at the Barry M. Goldwater Range
https://youtu.be/zgL_C8mZHqw (16 seconds)
Taken 03.03.2020
qt-wall-vid-211
USACE contractor using an excavator moves panels to the barrier installation site Yuma, Arizona
https://youtu.be/N34boNIUJww (31 seconds)
Taken 03.26.2020
qt-wall-vid-212
Crews conduct site work in preparation for border barrier installation near Lukeville, Arizona
https://youtu.be/IYCbaCVb-XI (15 seconds)
Taken 03.24.2020
qt-wall-vid-213
#USACE contractor crews conduct site work in preparation for border barrier
https://youtu.be/w4IkRpxnXb4 (24 seconds)
Taken 03.25.2020
qt-wall-vid-214
#USACE South Pacific Border District contractor pour concrete for the border wall near Lukeville, AZ
https://youtu.be/QmkF9dKy0CU (30 seconds)
Taken 03.25.2020
qt-wall-vid-215
Time-lapse of #USACE contractor crews install border barrier through the night near Columbus, NM
https://youtu.be/6vyRakc56G4 (30 seconds)
Taken 04.17.2020
qt-wall-vid-216
#USACE #SPBD contractor crews dig a trench for the border barrier installation near Columbus, NM
https://youtu.be/OLscJX3M4-U (10 seconds)
Taken 04.16.2020
qt-wall-vid-217
Crews install border barrier to replace existing Normandy-style border barrier near Columbus, NM
https://youtu.be/OzuynS-Fcvw (7 seconds)
Taken 04.16.2020
qt-wall-vid-218
#USACE SPBD contractors stage rebar and bollards for the Yuma 2 border barrier project near Yuma, AZ
https://youtu.be/_qaTw08wJbA (31 seconds)
Taken 05.21.2020
qt-wall-vid-219
#USACE SPBD contractors construct the Yuma 2 border barrier construction project near Yuma, AZ
https://youtu.be/1fmjUdzFJCI (31 seconds)
Taken 05.21.2020
qt-wall-vid-220
Engineers from #USACE #SPBD drive between border barriers at the Yuma 2 near Yuma, AZ, May 21, 2020
https://youtu.be/FpahWpMOTMs (31 seconds)
Taken 05.21.2020
qt-wall-vid-221
Time-lapse contruction of the Yuma 2 border barrier project near Yuma, Arizona, May 21, 2020
https://youtu.be/_uSUfisfix0 (28 seconds)
Taken 05.21.2020
qt-wall-vid-222
Contractors working on Yuma 2 border barrier for #USACE South Pacific Border District near Yuma, AZ
https://youtu.be/kFEGzTO2rQ0 (26 seconds)
Taken 05.21.2020
qt-wall-vid-223
Contractors put finishing touches on a bend new Morales Dam near Yuma, Arizona on June 5, 2020
https://youtu.be/pQMgn75P9Nk (44 seconds)
Taken 06.05.2020
qt-wall-vid-224
U.S. #CBP promotional video on the Border Wall Construction along the US-MX border
https://youtu.be/YAIVY-6IyLM (3:33)
Taken 06.23.2020
qt-wall-vid-225
U.S. President Donald J. Trump visit to the border wall on June 23, 2020
https://youtu.be/o-6CATGnwgU (5:24)
Taken 06.23.2020
qt-wall-vid-226
#USACE contractors place bollards on the El Paso 5 border barrier project near Fabens, Texas, Jun 30
https://youtu.be/_MV17z8ca04 (44 seconds)
Taken 06.30.2020
qt-wall-vid-227
Contractors prepare cement and concrete for San Diego 15 border barrier project near Campo, Calif
https://youtu.be/YMw3gRmdiIE (41 seconds)
Taken 07.21.2020
qt-wall-vid-228
Contractors drive bridge piles on the San Pedro River bank at a border barrier project near Naco, AZ
https://youtu.be/7lxohnGAcSw (43 seconds)
Taken 08.11.2020
qt-wall-vid-229